NEW QUESTION 33
In which of the following objects can you activate backflushing of components if you want to use this functionality during order confirmation? (Choose three.)

  • A. Work Center
  • B. Material Master (Component)
  • C. Production Scheduling Profile
  • D. Routing
  • E. Material Master (Finished Product)

Answer: A,B,D

 

NEW QUESTION 34
What could be a consequence of confirming an operation?

  • A. The capacity requirements are updated
  • B. The production order is rescheduled
  • C. The planned costs are updated
  • D. The actual costs are settled

Answer: A

 

NEW QUESTION 35
Which of the following properties about the planning functions available in SAP ECC applies?

  • A. In demand management (DM) material shortage situations are identified and corresponding receipt elements are created.
  • B. Material requirements planning (MRP) includes automatic capacity leveling.
  • C. Long-term planning (LTP) is a long-term form of forecasting.
  • D. Master production scheduling (MPS) refers to preferred planning of important materials.

Answer: D

 

NEW QUESTION 36
When maintaining a work center, formulas can be assigned in the scheduling view. Formulas use formula parameters for calculation.
What can be the origin of the formula parameters used for scheduling? (Choose three)

  • A. Standard values in the operations of routings
  • B. General item values of bill of materials
  • C. User-defined fields in the operation of routings
  • D. General operation values of routings
  • E. General values from work scheduling view of the material master

Answer: A,C,D

 

NEW QUESTION 37
What do you have to consider regarding ATP checks in SAP ECC that are triggered from customer orders?

  • A. If the ATP check determines non-availability, it then checks in the next step whether timely procurement or production is possible.
  • B. The ATP check does not take stocks and receipts into account. It checks consumption of planned independent requirements.
  • C. An ATP check creates fixed links between customer orders and their confirmed receipts.
  • D. The ATP quantity is the available quantity that can be used to confirm incoming customer orders.

Answer: D

 

NEW QUESTION 38
What do you have to consider when you use SAP ECC long-term planning (LTP)? (Choose two)

  • A. LTP creates purchase requisitions for external procurement.
  • B. LTP focuses on the operational planning of important components.
  • C. A planning scenario must be released before it can be used in LTP.
  • D. Reorder point planned materials can be included in LTP.

Answer: C,D

 

NEW QUESTION 39
When testing requirements planning in plant 1000, you receive the error message displayed below. Large numbers of materials are already available in plant 1000. As a first step in solving the problem, you activate requirements planning in the Customizing for plant 1000.

What further tasks do you perform before you can use requirements planning in plant 1000 in SAP ECC?

  • A. Activate requirements planning in Customizing for MRP areas in plant 1000 and specify the plant parameters for plant 1000 in the MRP views in material master.
  • B. Set up the planning file in Customizing and specify the plant parameters for plant 1000 in Customizing.
  • C. Set up the planning files in Customizing and specify the plant parameters for plant 1000 in Customizing of the MRP group.
  • D. Set up the planning file in Customizing and specify the plant parameters for plant 1000 in the MRP views in material master.

Answer: B

 

NEW QUESTION 40
Where can you define the default storage location for the material component of a production order? (Choose three)

  • A. BOM header (product)
  • B. Production version (product)
  • C. Production supply area of a work center
  • D. Routing
  • E. Material master (component)

Answer: B,C,E

 

NEW QUESTION 41
You want to use the function "Read PP master data" in the production order.
However, while calling the function you receive an error message.
What could be the reason?

  • A. The production order has been released.
  • B. Order papers have been printed.
  • C. The material availability check has been performed.
  • D. Goods movements have been posted.

Answer: D

 

NEW QUESTION 42
Which issue can occur if the lot size-dependent in-house production time in the material master is not updated after changing the routing?

  • A. Requirements planning creates an appropriate exception message in basic dates scheduling.
  • B. Dependent requirements request the components from the bill of materials at wrong times when using basic dates scheduling.
  • C. Subsequent capacity planning is no longer possible due to the obsolete scheduling parameters.
  • D. Lead time scheduling cannot take place.

Answer: B

 

NEW QUESTION 43
Which of the following elements do you have to prepare for costing of a production order to function without errors? (Choose three.)

  • A. Propose a standard text key in work center.
  • B. Enter formulas for costing in the work center.
  • C. Assign a production scheduling profile to the material master (product).
  • D. Use an operation control key with the indicator costing-relevant.
  • E. Assign costing variants to order type.

Answer: B,D,E

 

NEW QUESTION 44
In which master data object do you set the standard values for an operation?

  • A. Production Resource/Tool (PRT)
  • B. Material Master
  • C. Routing
  • D. Work Center

Answer: C

 

NEW QUESTION 45
What are the consequences of setting a production order to Technically Complete (TECO)? (Choose three)

  • A. Capacity requirements are set to null.
  • B. The order and its operations receive the system status Locked (LKD).
  • C. Confirmations are no longer possible.
  • D. The order is no longer relevant for material requirements planning.
  • E. Reservations are no longer relevant for material requirements planning.

Answer: A,D,E

 

NEW QUESTION 46
What are characteristics of repetitive manufacturing? (Choose three)

  • A. Continuous material consumption, production flow and output
  • B. Production without using production orders and without status management
  • C. Period-based planning of the quantities to be produced
  • D. Automatic line loading based on capacity limits across all production lines
  • E. Shop fabrication

Answer: A,B,C

 

NEW QUESTION 47
In which scenario will the error message shown in the attached screenshot occur?
Exhibit:

Exhibit

  • A. A valid routing exists, but the material master is set to manual routing selection.
  • B. The selection method is set to "selection only by production version" in the material master.
  • C. A valid routing exists, but the Customizing for the order type is set to manual routing selection.
  • D. The routing is not valid at the explosion date.

Answer: D

 

NEW QUESTION 48
In what sequence are the steps of material requirements planning performed in SAP ECC?

  • A. 1. Net requirements calculation
    2. Lot sizing
    3. Determination of the procurement type
    4. Scheduling
  • B. 1. Net requirements calculation
    2. Lot sizing
    3. Scheduling
    4. Determination of the procurement type
  • C. 1. Calculation of safety stock
    2. Lot sizing
    3. Scheduling
    4. Determination of the procurement type
  • D. 1. Availability check
    2. Lot sizing
    3. Determination of the procurement type
    4. Scheduling

Answer: A

 

NEW QUESTION 49
What can you use to organize material staging for production orders? (Choose three)

  • A. Transfer orders
  • B. Material documents
  • C. Pull list
  • D. Logistics Information System (LIS)
  • E. KANBAN

Answer: A,C,E

 

NEW QUESTION 50
What features related to process orders can be used to fulfill Good Manufacturing Practices (GMP) requirements? (Choose three)

  • A. Resource selection
  • B. Approved master recipes
  • C. Availability check
  • D. Electronic batch record
  • E. Digital signature

Answer: B,D,E

 

NEW QUESTION 51
......