Jun-2024 New Version E_S4HCON2023 Certificate & Helpful Exam Dumps is Online [Q25-Q43]

Share

Jun-2024 New Version E_S4HCON2023 Certificate & Helpful Exam Dumps is Online

E_S4HCON2023 Free Certification Exam Material with 81 Q&As 

NEW QUESTION # 25
What do you need to know about the SAP ERP Upgrade and Update Guide?
There are 2 correct answers to this question.
Response:

  • A. It contains a section "free space requirements"
  • B. It is a database-specific document
  • C. It contains a troubleshooting section
  • D. It is target release specific

Answer: A,D


NEW QUESTION # 26
Which downtime optimization technique requires the minimized downtime service (MDS) from SAP?

  • A. Downtime Optimized Data Conversion (DoC)
  • B. Near-Zero Downtime Maintenance (nZDM)
  • C. Downtime Optimized DMO (DoDMO)
  • D. Near-Zero Downtime Technology (NZDT)

Answer: D


NEW QUESTION # 27
Which steps can SUM perform during an SAP S/4HANA conversion? Note; There are 2 correct answers to this question.

  • A. Database migration
  • B. Custom code analysis
  • C. Unicode conversion
  • D. Software update

Answer: A,D


NEW QUESTION # 28
You are planning to upgrade your SAP ECC 6.07 system running on a single codepage (SCP) to SAP ECC
6.08. What is the recommended option to perform this upgrade?
Please choose the correct answer.
Response:

  • A. Perform the Unicode conversion before the upgrade to SAP ECC 6.08.
  • B. Combine the upgrade and the Unicode conversion using the Twin Upgrade &Unicode Conversion (TU
    &UC) procedure.
  • C. Perform the upgrade to SAP ECC 6.08 before the Unicode conversion.
  • D. Combine the upgrade and the Unicode conversion using the Combined Upgrade &Unicode Conversion (CU &UC) procedure.

Answer: A


NEW QUESTION # 29
In which part of an upgrade does SUM allow you to generate ABAP loads (SGEN)?
There are 2 correct answers to this question.

  • A. Post-downtime
  • B. During uptime
  • C. During downtime
  • D. During SPDD

Answer: A,B


NEW QUESTION # 30
Which preparational steps must be performed for an SAP S/4HANA conversion?
There are 2 correct answers to this question.
Response:

  • A. Install add-on SAP Gateway 7.50
  • B. Uninstall Fiori apps not released for SAP_UI 7.50
  • C. Delete client 066 (Early Watch Client)
  • D. Uninstall industry extensions not supported by SAP S/4HANA

Answer: B,C


NEW QUESTION # 31
What is the different between the benchmaking and the repetition option of the Database Migration Option (DMO) of SUM?

  • A. The repetition option allows you to run the migration without a shadow system
  • B. The repetition option allows you to repeat the complete migration
  • C. The benchmaking option allows you to migration a specified set of tables
  • D. The benchmaking option allows you to repeat the uptime migration

Answer: C


NEW QUESTION # 32
You are performing an inplace SAP S/4HANA conversion including DMO. What is the latest point in time when you can reset the procedure without losing data?

  • A. The start of the Execution roadmap step
  • B. The end of the business downtime
  • C. The end of the database migration
  • D. The start of the business downtime

Answer: B


NEW QUESTION # 33
You performed a custom code check for an SAP S/4HANA conversion. In which transactions can you review the results?
There are 2 correct answers to this question.
Response:

  • A. SAT (Runtime Analysis)
  • B. SYCM (Simplification Database Content)
  • C. ATC (ABAP Test Cockpit)
  • D. SE80 (Object Navigator)

Answer: C,D


NEW QUESTION # 34
Which steps should be performed during the adjustment of dictionary objects (SPDD) in the development system, before SUM continues?
There are 2 correct answers to this question.
Response:

  • A. Release the transport request containing the modification adjustment
  • B. Assign the transport request as a modification adjustment transport
  • C. Manually activate the adjusted dictionary objects
  • D. Create "modified* versions of the objects that you need to adjust

Answer: B,D


NEW QUESTION # 35
What is the benefit of using the file UPGANA.XML from a previous SUM run?
Please choose the correct answer.
Response:

  • A. To make the progress information within SUM UI more accurate
  • B. To repeat specific phases during the SUM run
  • C. To skip selected phases during the SUM run
  • D. To auto-fill specific fields on selected screens on the SUM UI

Answer: A


NEW QUESTION # 36
During the configuration of the DMO for SUM, how does the tool behave if option "Do not compare table contents" is selected regarding table comparison?
Please choose the correct answer.
Response:

  • A. It performs a comparison on selected tables using check sum.
  • B. It performs a comparison of all tables using check sum.
  • C. It does NOT perform any table comparison.
  • D. It performs a comparison on all tables using row counts.

Answer: D


NEW QUESTION # 37
What phases of SUM will be executed during an SAP S/4HANA conversion including DMO?
There are 3 correct answers to this question.
Response:

  • A. Phase RUN_RSPTBFIL _ISUTABU
  • B. Phase RUN_RSDBSCPY
  • C. Phases DIFF*
  • D. Phases EU_IMPORT*
  • E. Phase DOWNCONF_DTTRANS

Answer: C,D,E


NEW QUESTION # 38
You are using the maintenance planner to calculate the required software components for your SAP S4HANA conversion. What do you need to know regarding SUM?

  • A. AA
  • B. As soon as the next SP level of SUM is available, the current version of SUM passes into "patch on request mode" immediately.

Answer: B


NEW QUESTION # 39
You are performing an SAP S/4HANA conversion of the development system. Which credentials do you use in which system to perform the adjustment of programs and other non-dictionary repository objects (SPAU)?
Please choose the correct answer.

  • A. Credentials of user DDIC in client 000 of the shadow system
  • B. Credentials of user DDIC in the development client of the development system
  • C. Credentials of a named user in the development client of the development system
  • D. Credentials of a named user in client 000 of the shadow system

Answer: C


NEW QUESTION # 40
What are the benefits of using the benchmarking option of the DMO for SUM? Note There are 2 correct answers to this question

  • A. You can find the optimal number of parallel H3load processes by monitoring host performance
  • B. You can record the modification adjustment during migration and use the transports in the next runs.
  • C. You can verify that the content of the download directory matches the stack XML file.
  • D. You can obtain migration duration tiles from a previous benchmark run that can be used to optimize the next runs

Answer: A,D


NEW QUESTION # 41
What do you need to consider when performing the SI checks for an SAP S/4HANA conversion? There are 2 correct answers to this question.

  • A. The SI checks are executed in the development system and the results are transported into the subsequent systems.
  • B. You need to build up a SI check framework by applying SAP notes.
  • C. You need an SAP system based on AS ABAP 7.50 or above for the SI check framework.
  • D. Depending on the SAP S/4HANA version, there are different SI check frameworks.

Answer: B,D


NEW QUESTION # 42
You want to use the downtime-optimized data conversion for your SAP S/4HANA conversion. What is the main difference from a standard SAP S/4HANA conversion?
Please choose the correct answer.
Response:

  • A. An additional temporary database is used during uptime
  • B. The repository is migrated in uptime
  • C. Dedicated application tables are migrated in uptime
  • D. TABIMJJPG is executed in uptime

Answer: C


NEW QUESTION # 43
......

Get The Important Preparation Guide With E_S4HCON2023 Dumps: https://www.actual4dumps.com/E_S4HCON2023-study-material.html

UPDATED E_S4HCON2023 Exam Questions Certification Test Engine to PDF: https://drive.google.com/open?id=19gczHwerIhA4Ckp1z-JS5Chh_zk_wZ7w