NEW QUESTION 27
You want to perform custom code check via ABAP test cockpit in preparation of your SAP S/4HANA conversion? What kind of SAP System can you use to generate the custom code migration worklist?
- A. A Standalone SAP system with ABAP 7.51 or above
- B. An SAP S4HANA 1709 sandbox system
- C. AA
Answer: A,B
NEW QUESTION 28
What do you need to know about the SAP ERP Upgrade and Update Guide?
There are 2 correct answers to this question.
Response:
- A. It contains a troubleshooting section
- B. It contains a section "free space requirements"
- C. It is a database-specific document
- D. It is target release specific
Answer: B,D
NEW QUESTION 29
SUM was registered at the SAP Host Agent. Based on which information does the SAP Host agent determine the path to the SUM directory?
- A. AA
- B. The path was stored in file sumabap.conf during registration
Answer: B
NEW QUESTION 30
- A. Kernel for target release, Linux, SAP HANA
- B. Kernel for target release, Windows, SAP MaxDB
- C. You are performing the corresponding maintenance transaction with the Maintenance Planner.
Which kernels do you need to select for the SAP S/4HANA conversion?
There are 2 correct answers to this question.
Response: - D. Kernel for target release, Windows, SAP HANA
- E. Kernel for source release, Windows, SAP MaxDB
Answer: C,D,E
NEW QUESTION 31
What can you achieve by setting the SUM parameter "migration_only" to 1 in parameter file SAPup_add.par?
Please choose the correct answer.
Response:
- A. A migration of the SAP system to a new hardware is performed, without performing an SAP S/4HANA conversion.
- B. A change of the database type is performed, without changing the software components.
- C. An upgrade of the software components is performed, without changing the database type.
- D. An SAP S/4HANA conversion is performed, without adapting the customer data.
Answer: B
NEW QUESTION 32
What is the benefit of using the file UPGANA.XML from a previous SUM run?
Please choose the correct answer.
Response:
- A. To auto-fill specific fields on selected screens on the SUM UI
- B. To repeat specific phases during the SUM run
- C. To make the progress information within SUM UI more accurate
- D. To skip selected phases during the SUM run
Answer: C
NEW QUESTION 33
You want to perform an SAP S/4HANA conversion using SUM with DMO. Which steps run before the beginning of the technical downtime, independent of your SUM configuration?
There are 3 correct answers to this question.
- A. Import of upgrade and language data from the download directory in phase TABIM UPG
- B. Activation of dictionary objects in phase ACT_UPG
- C. Creation of application tables in the SAP HANA database in phase EU_CLONE_MIG_DT_CREATE
- D. Import of dictionary objects from the download directory in phase DDIC_UPG
- E. Generation of the new ABAP loads in phase RUN_SGEN_GENER8
Answer: A,B,D
NEW QUESTION 34
Which maintenance events are possible with SUM for an SAP system based on AS ABAP 7.40 and above? There are 3 correct answers to this question.
- A. Dual Stack split
- B. Homogenous system copy
- C. Release upgrade
- D. Database migration
- E. Support Package Stack update
Answer: C,D,E
NEW QUESTION 35
You want to execute a Unicode Conversion only. Which approach do you need to follow?
Please choose the correct answer.
Response:
- A. SWPM using the Load procedure
- B. SWPM using the Backup / Restore procedure
- C. SUM with DMO
- D. SUM without DMO
Answer: A
NEW QUESTION 36
ICNV initialization does 3
- A. Creation of views
- B. Creation of flag
- C. AA
- D. Build index on flag column
Answer: A,B,D
NEW QUESTION 37
You are executing a standard SUM procedure to update an SAP system using main configuration mode "Standard". When will the shadow system be stopped for the last time?
Please choose the correct answer.
Response:
- A. As part of the cleanup process
- B. Early in the downtime
- C. Before the downtime starts
- D. At the end of the downtime
Answer: C
NEW QUESTION 38
You are upgrading a three-system landscape DEV - QAS - PRD. The upgrade project contains a Unicode conversion. You have already upgraded the DEV and the QAS system but not yet the PRD system. What do you need to consider? Please choose the correct answer.
- A. The transport domain of systems DEV and QAS must differ from the transport domain of system PRD.
- B. The upgrade of the PRD must be finished before you start new development in the DEV.
- C. The upgrade of the PRD must be finished before you import any transports from the upgraded DEV system into the PRD.
- D. The transport between Unicode and non-Unicode systems is forbidden.
Answer: C
NEW QUESTION 39
SUM was registered at the SAP Host Agent. Based on which information does the SAP Host Agent determine the path to the SUM directory.
- A. The path was stored in file host_prose during registration
- B. The path is taken from the URL entered in the browser to start SUM
- C. The path was stored in file sumabap conf during registration
- D. The path was stored to the environment of user <sid>adm during registration
Answer: D
NEW QUESTION 40
What do you need to consider when performing the SI checks for an SAP S/4HANA conversion?
There are 2 correct answers to this question.
Response:
- A. Depending on the SAP S/4HANA version, there are different SI check frameworks.
- B. You need to build up a SI check framework by applying SAP notes.
- C. The SI checks are executed in the development system and the results are transported into the subsequent systems.
- D. You need an SAP system based on AS ABAP 7.50 or above for the SI check framework.
Answer: A,B
NEW QUESTION 41
You have chosen the "Advanced" option during the main configuration of the SUM tool. Which steps take place via the shadow instance?
There are 2 correct answers to this question.
Response:
- A. Activation of dictionary objects (ACT_UPG)
- B. Switch to new repository (EU_SWITCH)
- C. Conversion of application tables (PARCONVJJPG)
- D. Modification adjustment (SPDD)
Answer: A,D
NEW QUESTION 42
You are performing an SAP S/4HANA conversion of the development system. Which credentials do you use in which system to perform the adjustment of programs and other non-dictionary repository objects (SPAU)?
Please choose the correct answer.
- A. Credentials of a named user in the development client of the development system
- B. Credentials of user DDIC in the development client of the development system
- C. Credentials of user DDIC in client 000 of the shadow system
- D. Credentials of a named user in client 000 of the shadow system
Answer: A
NEW QUESTION 43
You are performing an SAP S/4HANA conversion for your production system. This conversion requires that certain business functions are switched on.
Following SAP recommendations, how will you achieve this?
There are 2 correct answers to this question.
Response:
- A. Specify the business functions that need to be switched on during the prepare part of SUM.
- B. Import a transport request from the development system that contains the recording of the activation.
- C. Activate the required business functions manually in the production system.
- D. During conversion, SUM delivers some business functions already activated.
Answer: B,D
NEW QUESTION 44
In which part of an upgrade does SUM allow you to generate ABAP loads (SGEN)?
There are 2 correct answers to this question.
- A. During downtime
- B. During SPDD
- C. Post-downtime
- D. During uptime
Answer: C,D
NEW QUESTION 45
You are planning to upgrade your SAP ECC 6.07 system running on a single codepage (SCP) to SAP ECC 6.08. What is the recommended option to perform this upgrade?
Please choose the correct answer.
Response:
- A. Perform the Unicode conversion before the upgrade to SAP ECC 6.08.
- B. Perform the upgrade to SAP ECC 6.08 before the Unicode conversion.
- C. Combine the upgrade and the Unicode conversion using the Twin Upgrade &Unicode Conversion (TU &UC) procedure.
- D. Combine the upgrade and the Unicode conversion using the Combined Upgrade &Unicode Conversion (CU &UC) procedure.
Answer: A
NEW QUESTION 46
You are performing an upgrade with SUM using DMO to an AS ABAP 7.50 based SAP system. You entered a specific number of R3Ioad processes during Roadmap step "Extraction".
Where can you change this during the migration via the Utilities option of the SUM UI?
There are 2 correct answers to this question
Response:
- A. In Process Control Center
- B. In SUM Parameters
- C. In DMO Migration Preparation
- D. In SUM Phaselist
Answer: A,B
NEW QUESTION 47
You are planning to upgrade your SAP ECC 6.07 system running on a single codepage (SCP) to SAP ECC
6.08. What is the recommended option to perform this upgrade?
Please choose the correct answer.
Response:
- A. Combine the upgrade and the Unicode conversion using the Twin Upgrade & Unicode Conversion (TU
& UC) procedure. - B. Perform the Unicode conversion before the upgrade to SAP ECC 6.08.
- C. Perform the upgrade to SAP ECC 6.08 before the Unicode conversion.
- D. Combine the upgrade and the Unicode conversion using the Combined Upgrade & Unicode Conversion (CU & UC) procedure.
Answer: B
NEW QUESTION 48
During the configuration of the DMO for SUM, how does the tool behave if option "Do not compare table contents" is selected regarding table comparison?
Please choose the correct answer.
Response:
- A. It performs a comparison on all tables using row counts.
- B. It does NOT perform any table comparison.
- C. It performs a comparison on selected tables using check sum.
- D. It performs a comparison of all tables using check sum.
Answer: A
NEW QUESTION 49
You are planning to use DMO of SUM to perform an "inplace-migration" to SAP HANA.
The source system is non-Unicode and the target database is a scale-out system.
What do you need to consider?
There are 2 correct answers to this question.
- A. Network capacity between exporting and importing R31oad processes must be considered.
- B. Unicode conversion is part of DMO only in case of target version AS ABAP 7.40 or 7.31.
- C. SAP HANA Landscape Reorganization requires a manual step to edit a file.
- D. The target database size increases temporarily because of the Shadow Repository.
Answer: B,C
NEW QUESTION 50
You are performing an upgrade with SUM. You are in the BIND_PATCH phase of the roadmap step
"Configuration". For some software components you find entries in the "Calculated level" column.
What does the "Calculated level" indicate for those software components?
Please choose the correct answer.
Response:
- A. The SAP Support packages of the Support Package Stack, calculated by the Maintenance Planner
- B. The SAP Support Packages contained in the upgrade media
- C. The SAP Support Packages found in the download directory
- D. The SAP Support Packages that will be bound to the upgrade
Answer: C
NEW QUESTION 51
......
SAP E_S4HCON2020 Exam Syllabus Topics:
| Topic | Details |
|---|---|
| Topic 1 |
|
| Topic 2 |
|
| Topic 3 |
|
| Topic 4 |
|
| Topic 5 |
|
| Topic 6 |
|
| Topic 7 |
|
E_S4HCON2020 Exam Dumps - PDF Questions and Testing Engine: https://www.actual4dumps.com/E_S4HCON2020-study-material.html