NEW QUESTION # 42
In SAP documentation for MRP in Advanced Planning, you read that the MRP creates new planned orders through infinite scheduling. What does this mean for the capacity requirements of the new planned order?
- A. MRP automatically assigns the capacity requirements after the last scheduled operation for each resource.
- B. MRP creates the capacity requirements on resources at the earliest possible production time.
- C. MRP automatically assigns the capacity requirements to resources with the earliest available capacity.
- D. MRP creates the capacity requirements without considering existing load on the resources.
Answer: D
NEW QUESTION # 43
What is a prerequisite for the consumption of planned independent requirements to take place for planning strategy 40 (Planning with final assembly)?
- A. MRP creates a planned order.
- B. A sales order is created.
- C. MRP creates a dependent requirement.
- D. A sales order is delivered.
Answer: B
NEW QUESTION # 44
Which of the following are features of the clean core dashboard?
Note: There are 2 correct answers to this question.
- A. Customers can use the dashboard in the dev, test, and production tenants.
- B. Customers can grant access to the dashboard to partners.
- C. It can be accessed by using SAP For Me.
- D. It can be used in all SAP S/4HANA Cloud editions.
Answer: B,C
NEW QUESTION # 45
What are the selection criteria of a bill of material (BOM) alternative?
Note: There are 2 correct answers to this question.
- A. Lot size
- B. Change number
- C. Date
- D. Material BOM usage
Answer: A,C
NEW QUESTION # 46
How do you model a production line in repetitive manufacturing?
- A. As an operation
- B. As a routing
- C. As a work center
- D. As a resource network
Answer: C
NEW QUESTION # 47
What does the material type influence?
Note: There are 2 correct answers to this question.
- A. Which document types and class categories are allowed
- B. Which number range interval the material number comes from
- C. Whether value changes to financial accounting stock accounts are updated
- D. Which plant-specific and plant-independent statuses are allowed
Answer: B,C
NEW QUESTION # 48
Your project team decides to use a make-to-order planning strategy for a strategic material in discrete manufacturing. What are the impacts of this decision?
Note: There are 3 correct answers to this question.
- A. Sales orders have to be ATP-confirmed (available-to-promise) to be saved.
- B. Planned orders are created in MRP with reference to sales orders.
- C. Net requirements calculation is carried out for every sales order individually.
- D. Production and procurement costs are managed on the sales order item level.
- E. Storage location MRP areas are required to manage sales-order-specific stock.
Answer: B,C,D
NEW QUESTION # 49
What will happen in the MRP run if you have created a new MRP-relevant material that supports both in-house production and external procurement?
- A. The MRP run plans the material only if a quotation has been maintained.
- B. The MRP run starts with external procurement.
- C. The MRP run starts with in-house production.
- D. The MRP run does NOT consider the material; it has to be planned interactively.
Answer: C
NEW QUESTION # 50
What are some advantages of using Kanban for material supply? Note: There are 2 correct answers to this question.
- A. Replenishment is only triggered when components are required.
- B. Replenishment is always triggered on a regular basis.
- C. Material is only kept available in small quantities in production.
- D. Material stock is built up for a long period of time in production.
Answer: A,C
NEW QUESTION # 51
What are some options for creating a production order?
Note: There are 2 correct answers to this question.
- A. By setting a Kanban container to full
- B. By partially converting a planned order
- C. By setting a Kanban container to empty
- D. By converting a purchase requisition
Answer: B,C
NEW QUESTION # 52
Which time elements are relevant for lead time scheduling of a production order?
Note: There are 2 correct answers to this question.
- A. Total replenishment lead time
- B. Float after production
- C. Setup time
- D. Opening period
Answer: B,C
NEW QUESTION # 53
Which master data fields can have an impact on whether MRP creates planned orders or purchase requisitions for a material? Note: There are 2 correct answers to this question.
- A. Procurement type
- B. MRP group
- C. Material type
- D. MRP type
Answer: A,D
NEW QUESTION # 54
Which of the following elements does MRP take into account during net requirement calculation?
Note: There are 2 correct answers to this question.
- A. ATP quantities
- B. Production orders
- C. Planned orders (firmed)
- D. Planned orders (unfirmed)
Answer: B,C
NEW QUESTION # 55
What is a work center hierarchy?
- A. A group of alternative work centers for production, structured in hierarchy levels by priorities
- B. A group of work centers in a production line that is used in sequence for production
- C. A group of work centers in a parallel sequence that is used to split production quantities and work on them in parallel
- D. A group of alternative work centers providing a cumulative available capacity for production
Answer: D
NEW QUESTION # 56
When can you maintain the batch characteristic values in SAP S/4HANA?
Note: There are 2 correct answers to this question.
- A. When you post the goods receipt
- B. When you record inspection results
- C. When you execute batch determination
- D. When you release the batch
Answer: A,B
NEW QUESTION # 57
How can you limit the validity of a bill of material (BOM)?
Note: There are 2 correct answers to this question.
- A. By material type
- B. By plant
- C. By change number
- D. By material status
Answer: A,B
NEW QUESTION # 58
You want to set up a make-to-order planning scenario for a finished product. The bill of material contains two components: one should be procured for each sales order individually, and the other should be procured jointly for all independent requirements. Forecasting for the finished product is NOT possible. Which settings do you make to achieve this?
- A. Choose planning strategy 50 (Planning without final assembly) and select the corresponding Individual/Collective indicator
- B. Choose planning strategy 50 (Planning without final assembly) and select the corresponding Mixed MRP indicator
- C. Choose planning strategy 20 (Make-to-Order) and select the corresponding Mixed MRP indicator
- D. Choose planning strategy 20 (Make-to-Order) and select the corresponding Individual/Collective indicator
Answer: D
NEW QUESTION # 59
Mode selection is one of the scheduling options available with Advanced Planning in SAP S/4HANA Cloud Private Edition. When can you use mode selection?
- A. When several production versions are maintained for one product
- B. When alternative resources are used within one operation
- C. When several operations are maintained for one product
- D. When multiple planned orders are scheduled in parallel on one resource
Answer: B
NEW QUESTION # 60
What is the purpose of the pull list in material staging?
- A. To control the flow of material from the central storage location to the production storage location
- B. To control the flow of material from the production storage location to the central storage location
- C. To control the flow of material from the supplier to the central storage location
- D. To control the flow of material from the supplier to the production storage location
Answer: A
NEW QUESTION # 61
Why would you use phantom assemblies?
Note: There are 2 correct answers to this question.
- A. To make the assignment of components easier
- B. To enable simple structuring of BOMs
- C. To make the procurement easier
- D. To reduce the number of material masters
Answer: A,B
NEW QUESTION # 62
Which options do you have to post goods receipt for a process order?
Note: There are 2 correct answers to this question.
- A. You post the entire manufactured quantity to multiple batches if the product quality changes during production.
- B. You post the entire manufactured quantity to multiple batches if the product quality remains consistent during production.
- C. You post the entire manufactured quantity to one batch if the product quality changes during production.
- D. You post the entire manufactured quantity to one batch if the product quality remains consistent during production.
Answer: A,D
NEW QUESTION # 63
Which options do you have to exclude Advanced Planning materials from the standard MRP run in SAP S/4HANA?
Note: There are 2 correct answers to this question.
- A. Use the special MRP type XO
- B. Use the material number for selection
- C. Use a different MRP planner for PP/DS materials
- D. Use a propagation range
Answer: A,C
NEW QUESTION # 64
......